DevTools
svn1
svn1-original
testRepo
BlueGrey
calm
Elegant
Català-Valencià – Catalan
中文 – Chinese (Simplified)
中文 – Chinese (Traditional)
Česky – Czech
Dansk – Danish
Nederlands – Dutch
English – English
Suomi – Finnish
Français – French
Deutsch – German
עברית – Hebrew
हिंदी – Hindi
Magyar – Hungarian
Bahasa Indonesia – Indonesian
Italiano – Italian
日本語 – Japanese
한국어 – Korean
Македонски – Macedonian
मराठी – Marathi
Norsk – Norwegian
Polski – Polish
Português – Portuguese
Português – Portuguese (Brazil)
Русский – Russian
Slovenčina – Slovak
Slovenščina – Slovenian
Español – Spanish
Svenska – Swedish
Türkçe – Turkish
Українська – Ukrainian
Oëzbekcha – Uzbek
Subversion Repositories
DevTools
(root)
/
core_devl
/
branches
/
gitBuilder
/
TOOLS
/
gen_msprojects.pl
@ 7498
– Rev 7323
Rev
Show changed files
|
Details
|
Compare with Previous
|
Blame
|
RSS feed
Filtering Options
From rev
To rev
Max revs
Search history for
Show All
Rev
Age
Author
Path
Log message
Diff
7323
2300 d 17 h
dpurdie
/core_devl/branches/gitBuilder/
Merge from SVN002
7300
2300 d 20 h
dpurdie
/core_devl/branches/gitBuilder/
7299
2300 d 20 h
dpurdie
/core_devl/branches/gitBuilder/
Created to duplicate the work done on svn002
5709
3525 d 16 h
dpurdie
/core_devl/trunk/
Updated VIX copyright notice in all files that had a VIX or ERG copyright notice
361
5295 d 7 h
dpurdie
/core_devl/trunk/
DevTools/core_devl: Checkin by Svn Import
Major changes:
* HTML Help (Experimental)
Generated documentation for the various JATS utilities
It is based on the internal JATS documentation available on the command
line.
Use
http://auperaunx26.aupera.erggroup.com/devl/core_devl2/HTML/index.html
Minor changes:
* PackageFile directive
Allow packaging of files with a comma in the name.
Used by some COTS packages.
* Windows utilities used by jats
stdmux and rpccpp: provide production versions that do not use debug
libraries as these are not present for all users.
* Jats utility: dstatus
Shows the user friendly host name rather then the internal machine name.
This change is in line with the changes to Release Manager
* Utility: svnrelease
Better deletion of workspaces referenced with non-standard URLs
Corrected problem with -branch=name option
* Utility: svnrelease and ccrelease
Better deletion of workingspace directory.
Attempt to correct for directory permission problems.
* Updated definition of GBE_SVN_URL_FRBESASVN01 to use
the server by name, rather than IP address: 'frbesasvn01'
* Added EnvVar GBE_VCS to control the default Version Control System
employed by the 'jats release' and 'jats extract' commands.
Usable values are: 'cc' and 'svn'.
The default value is 'cc', providing backward compatability to existing
developers.
227
6578 d 12 h
dpurdie
/core_devl/trunk/
DevTools/core_devl: Checkin by Svn Import
First Release in Release Manager
Major changes:
Minor changes:
* Jats Tool: create_dpkg
Added options to allow the utility to sanity test the package name and
version of the package being created. This is intended to be used by the
automated build system. New options are:
-pname=Package_Name
-pversion=Package_Version
Added option to allow the source package form to be tested, without
transferring the package. New options are:
-test
* Jats Tool: CCdiff
-output=filename now works. Previously only -out=filename worked.
-vob=name does not generate internal message under unix
* JATS Environment variables GBE_BUILDFILTER and GBE_PLATFORM can be either
a space separated or a comma separated list.
* Solaris Toolset
Disable the use of purify, purecov and quantify when building shared
libraries. Shared libraries are not supported by these tools. Executable
programs are still supported.