| Rev |
Age |
Author |
Path |
Log message |
Diff |
| 6798 |
2572 d 1 h |
dpurdie |
/core_devl/trunk/ |
Minor changes:
* Support for Perl 5.26
Removed . from the @INC which affects some searching.
Perl 5.26 is not recommended, but is a part of Ubuntu 18.
* GCC Toolset
[JATS-445] Improved handling of Unit Tests that have not been
built, but are attempted to run.
* New Platform - STIBAXIO
The AXIO device from Parkeon as used in STIB.
Version Imported from Pulse |
|
| 6177 |
3070 d 7 h |
dpurdie |
/core_devl/trunk/ |
------------------------------------------------------------------------
Version: 3.14.4000.cr Released: 07-Aug-17
------------------------------------------------------------------------
Minor changes:
* Utility: jat_svnrelease [JATS-424]
Handle obscure condition where the tag has been created directly from
a merge and the merge involved the deletion of files from the fileset.
* Buildfiles.
Restored VS2005 to the MSWIN32 alias
------------------------------------------------------------------------
Version: 3.14.3000.cr Released: 02-Aug-17
------------------------------------------------------------------------
Minor changes:
* Utility: jats_generate_deployable
Can create .bomGen file from scratch
Improved reporting of files add, removed and updated
* Makefile generation
Correctly export 'PACKAGE_ARCH' as a global
------------------------------------------------------------------------
Version: 3.14.2000.cr Released: 04-Jul-17
------------------------------------------------------------------------
Minor changes:
* Platform: RHEL7_INSTRUMENT
Marked as a NATIVE build.
* Platforms: LMOS_*
Inherit system aliases from base platform configuration.
------------------------------------------------------------------------
Version: 3.14.1000.cr Released: 03-Jul-17
------------------------------------------------------------------------
Minor changes:
* Updated copyright notices in all files
* jats_extract
Will no longer create a 'local_dpkg_archive'
The use of a 'local_dpkg_archive' is deprecated in favor of the jats
'sandbox', which does a much better job.
* Utility: jats_generate_deployable
Windows: Fixed compilation error
* Platform: RHEL7_INSTRUMENT
Added missing configuration file
------------------------------------------------------------------------
Version: 3.14.0000.cr Released: 23-Jun-17
------------------------------------------------------------------------
Minor changes:
* JAVA Platform [JATS-420]
The java builder can use an 'ant' provided by a suitable package
ie: ant_1.9.2.0000.cots
------------------------------------------------------------------------
Version: 3.13.9000.cr Released: 22-Jun-17
------------------------------------------------------------------------
Minor changes:
* Corrected use of shell 'echo' command
Always quote the string
Issue was the unquoted use of a string that contained matching square brackets
ie: echo [$<] Compiling..
The [..] construct is a filename expanding construct.
* Win32 and Win64 makefile generation
Allow the 'cmdfile' commands to be shown in verbose mode.
* Makefile generation
Fixed issue with some build formats and a bug in cmdfile when no path item
has a directory separator.
------------------------------------------------------------------------
Version: 3.13.8000.cr Released: 16-Jun-17
------------------------------------------------------------------------
Minor changes:
* Makefiles: New Directive: ExtendIncDir
ExtendIncDir ('*', 'private' );
Specialised use only. See MASS-00166
* Utility: jats_svnrelease
The 'extractFiles' option will display the files extracted when
running on a build machine.
* Windows builds
[JATS-419] Visual Studio builds fail with fatal error C1090: PDB API call failed, error code '23'
Use same value for _MSPDBSRV_ENDPOINT_ in all makefiles
------------------------------------------------------------------------
Version: 3.13.7000.cr Released: 13-Jun-17
------------------------------------------------------------------------
Minor changes:
* Utility: jats
Added option -script. Supresses internal warnings when capturing
output within a scripting environment.
* Utility: sandbox
Allow the build.pl file to be upto 4 directories deep
Slows down sandbox scanning
Provides backward compatability with old projects
* Makefile directive: MakePerl
Added option to control the output format to better support multiple
build machines.
* Build File
Fixed handling of aliases that broke the (not recommended) construct
BuildProduct ( 'CSHARP2010', 'WIN32,--Version=MS.NET2010' );
* Windows builds
[JATS-419] Visual Studio builds fail with fatal error C1090: PDB API call failed, error code '23'
Experimental:
* New platform: RHEL7_INSTRUMENT and RHEL7
Supported on RHEL7 and Centos with a MACHTYPE of linux_el7_x64
* Makefiles. New aliases
PKG_DEB, PKG_RPM and PKG_WIN
Internal use only at the moment |
|
| 5709 |
3536 d 2 h |
dpurdie |
/core_devl/trunk/ |
Updated VIX copyright notice in all files that had a VIX or ERG copyright notice |
|
| 361 |
5305 d 17 h |
dpurdie |
/core_devl/trunk/ |
DevTools/core_devl: Checkin by Svn Import
Major changes:
* HTML Help (Experimental)
Generated documentation for the various JATS utilities
It is based on the internal JATS documentation available on the command
line.
Use http://auperaunx26.aupera.erggroup.com/devl/core_devl2/HTML/index.html
Minor changes:
* PackageFile directive
Allow packaging of files with a comma in the name.
Used by some COTS packages.
* Windows utilities used by jats
stdmux and rpccpp: provide production versions that do not use debug
libraries as these are not present for all users.
* Jats utility: dstatus
Shows the user friendly host name rather then the internal machine name.
This change is in line with the changes to Release Manager
* Utility: svnrelease
Better deletion of workspaces referenced with non-standard URLs
Corrected problem with -branch=name option
* Utility: svnrelease and ccrelease
Better deletion of workingspace directory.
Attempt to correct for directory permission problems.
* Updated definition of GBE_SVN_URL_FRBESASVN01 to use
the server by name, rather than IP address: 'frbesasvn01'
* Added EnvVar GBE_VCS to control the default Version Control System
employed by the 'jats release' and 'jats extract' commands.
Usable values are: 'cc' and 'svn'.
The default value is 'cc', providing backward compatability to existing
developers. |
|
| 227 |
6588 d 22 h |
dpurdie |
/core_devl/trunk/ |
DevTools/core_devl: Checkin by Svn Import
First Release in Release Manager
Major changes:
Minor changes:
* Jats Tool: create_dpkg
Added options to allow the utility to sanity test the package name and
version of the package being created. This is intended to be used by the
automated build system. New options are:
-pname=Package_Name
-pversion=Package_Version
Added option to allow the source package form to be tested, without
transferring the package. New options are:
-test
* Jats Tool: CCdiff
-output=filename now works. Previously only -out=filename worked.
-vob=name does not generate internal message under unix
* JATS Environment variables GBE_BUILDFILTER and GBE_PLATFORM can be either
a space separated or a comma separated list.
* Solaris Toolset
Disable the use of purify, purecov and quantify when building shared
libraries. Shared libraries are not supported by these tools. Executable
programs are still supported. |
|