Subversion Repositories DevTools

Rev

Show changed files | Details | Compare with Previous | Blame | RSS feed

Filtering Options

Rev Age Author Path Log message Diff
7323 2304 d 23 h dpurdie /core_devl/branches/gitBuilder/ Merge from SVN002  
7300 2305 d 2 h dpurdie /core_devl/branches/gitBuilder/  
7299 2305 d 3 h dpurdie /core_devl/branches/gitBuilder/ Created to duplicate the work done on svn002  
5709 3529 d 22 h dpurdie /core_devl/trunk/ Updated VIX copyright notice in all files that had a VIX or ERG copyright notice  
361 5299 d 13 h dpurdie /core_devl/trunk/ DevTools/core_devl: Checkin by Svn Import
Major changes:
* HTML Help (Experimental)
Generated documentation for the various JATS utilities
It is based on the internal JATS documentation available on the command
line.

Use http://auperaunx26.aupera.erggroup.com/devl/core_devl2/HTML/index.html

Minor changes:
* PackageFile directive
Allow packaging of files with a comma in the name.
Used by some COTS packages.

* Windows utilities used by jats
stdmux and rpccpp: provide production versions that do not use debug
libraries as these are not present for all users.

* Jats utility: dstatus
Shows the user friendly host name rather then the internal machine name.
This change is in line with the changes to Release Manager

* Utility: svnrelease
Better deletion of workspaces referenced with non-standard URLs
Corrected problem with -branch=name option

* Utility: svnrelease and ccrelease
Better deletion of workingspace directory.
Attempt to correct for directory permission problems.

* Updated definition of GBE_SVN_URL_FRBESASVN01 to use
the server by name, rather than IP address: 'frbesasvn01'

* Added EnvVar GBE_VCS to control the default Version Control System
employed by the 'jats release' and 'jats extract' commands.

Usable values are: 'cc' and 'svn'.
The default value is 'cc', providing backward compatability to existing
developers.
 
227 6582 d 18 h dpurdie /core_devl/trunk/ DevTools/core_devl: Checkin by Svn Import
First Release in Release Manager
Major changes:

Minor changes:
* Jats Tool: create_dpkg
Added options to allow the utility to sanity test the package name and
version of the package being created. This is intended to be used by the
automated build system. New options are:
-pname=Package_Name
-pversion=Package_Version

Added option to allow the source package form to be tested, without
transferring the package. New options are:
-test

* Jats Tool: CCdiff
-output=filename now works. Previously only -out=filename worked.
-vob=name does not generate internal message under unix

* JATS Environment variables GBE_BUILDFILTER and GBE_PLATFORM can be either
a space separated or a comma separated list.

* Solaris Toolset
Disable the use of purify, purecov and quantify when building shared
libraries. Shared libraries are not supported by these tools. Executable
programs are still supported.