| 361 |
5294 d 11 h |
dpurdie |
/core_devl/trunk/ |
DevTools/core_devl: Checkin by Svn Import
Major changes:
* HTML Help (Experimental)
Generated documentation for the various JATS utilities
It is based on the internal JATS documentation available on the command
line.
Use http://auperaunx26.aupera.erggroup.com/devl/core_devl2/HTML/index.html
Minor changes:
* PackageFile directive
Allow packaging of files with a comma in the name.
Used by some COTS packages.
* Windows utilities used by jats
stdmux and rpccpp: provide production versions that do not use debug
libraries as these are not present for all users.
* Jats utility: dstatus
Shows the user friendly host name rather then the internal machine name.
This change is in line with the changes to Release Manager
* Utility: svnrelease
Better deletion of workspaces referenced with non-standard URLs
Corrected problem with -branch=name option
* Utility: svnrelease and ccrelease
Better deletion of workingspace directory.
Attempt to correct for directory permission problems.
* Updated definition of GBE_SVN_URL_FRBESASVN01 to use
the server by name, rather than IP address: 'frbesasvn01'
* Added EnvVar GBE_VCS to control the default Version Control System
employed by the 'jats release' and 'jats extract' commands.
Usable values are: 'cc' and 'svn'.
The default value is 'cc', providing backward compatability to existing
developers. |
|
/core_devl/trunk/HTML /core_devl/trunk/HTML/Jats.css /core_devl/trunk/HTML/JatsToc.css /core_devl/trunk/HTML/JatsWelcome.html /core_devl/trunk/HTML/displayToc.js /core_devl/trunk/HTML/favicon.ico /core_devl/trunk/HTML/images /core_devl/trunk/HTML/images/VIX Tech logo_RGB.png /core_devl/trunk/HTML/images/delete.png /core_devl/trunk/HTML/images/greysmallbullet.gif /core_devl/trunk/HTML/images/jats_buildsystem.png /core_devl/trunk/HTML/images/jats_logo.png /core_devl/trunk/HTML/images/leaf.gif /core_devl/trunk/HTML/images/minus.gif /core_devl/trunk/HTML/images/page.gif /core_devl/trunk/HTML/images/plus.gif /core_devl/trunk/HTML/images/run.png /core_devl/trunk/HTML/images/x.gif /core_devl/trunk/HTML/images/xlink.gif /core_devl/trunk/HTML/index.html /core_devl/trunk/HTML/scineplex.css /core_devl/trunk/HTML/tocParas.js /core_devl/trunk/HTML/tocTab.js /core_devl/trunk/HTML/topframe.html /core_devl/trunk/TOOLS/LIB/JatsDocTools /core_devl/trunk/TOOLS/LIB/JatsDocTools/JatsDocTools.pm /core_devl/trunk/TOOLS/LIB/JatsDocTools/Pod.pm /core_devl/trunk/TOOLS/LIB/JatsDocTools/TOC /core_devl/trunk/TOOLS/LIB/JatsDocTools/TOC.pm /core_devl/trunk/TOOLS/LIB/JatsDocTools/TOC/HTML.pm /core_devl/trunk/TOOLS/LIB/JatsDocTools/Tree /core_devl/trunk/TOOLS/LIB/JatsDocTools/Tree/HTML.pm /core_devl/trunk/TOOLS/LIB/Pod/Html.pm /core_devl/trunk/TOOLS/POD/FAQ /core_devl/trunk/TOOLS/POD/FAQ/AddingAnIconToAWindowsEXE.pod /core_devl/trunk/TOOLS/POD/FAQ/AddingVersionInfoToAWindowsDLL.pod /core_devl/trunk/TOOLS/POD/FAQ/Compile_Windows_Resources.pod /core_devl/trunk/TOOLS/POD/FAQ/Creating_an_API_Package.pod /core_devl/trunk/TOOLS/POD/FAQ/Insert_Version_Information_into_a_File.pod /core_devl/trunk/TOOLS/POD/FAQ/Merge_Static_Libraries.pod /core_devl/trunk/TOOLS/POD/FAQ/MessageCompiler.pod /core_devl/trunk/TOOLS/POD/FAQ/Using_Buildfilter_To_Speedup_Test_Builds.pod /core_devl/trunk/TOOLS/jats_cclabel.pl
/core_devl/trunk/TOOLS/jats_label.pl
/core_devl/trunk/BIN.win32/rpccpp.exe /core_devl/trunk/BIN.win32/stdmux.exe /core_devl/trunk/BUILD/MakePackage.pl /core_devl/trunk/BUILD/makefile.pl /core_devl/trunk/ChangeLog.txt /core_devl/trunk/TEMPLATES/INSTALL/linux.profile.jats.sh /core_devl/trunk/TEMPLATES/INSTALL/linux.ubuntu.profile.jats.sh /core_devl/trunk/TOOLS/CCbc2.pl /core_devl/trunk/TOOLS/CCdiff.pl /core_devl/trunk/TOOLS/LIB/DeployUtils/RmPkgInfo.pm /core_devl/trunk/TOOLS/LIB/FileUtils.pm /core_devl/trunk/TOOLS/LIB/JatsSvn.pm /core_devl/trunk/TOOLS/POD/EnvVars.pod /core_devl/trunk/TOOLS/POD/InstallationNotes.pod /core_devl/trunk/TOOLS/POD/OverView.pod /core_devl/trunk/TOOLS/POD/PkgArchives.pod /core_devl/trunk/TOOLS/buildlib.pl /core_devl/trunk/TOOLS/cache_dpkg.pl /core_devl/trunk/TOOLS/create_dpkg.pl /core_devl/trunk/TOOLS/dstatus.pl /core_devl/trunk/TOOLS/escrow.pl /core_devl/trunk/TOOLS/gen_cots.pl /core_devl/trunk/TOOLS/gen_dirlist.pl /core_devl/trunk/TOOLS/gen_metrics.pl /core_devl/trunk/TOOLS/gen_msprojects.pl /core_devl/trunk/TOOLS/gen_packagelist.pl /core_devl/trunk/TOOLS/gen_winrc.pl /core_devl/trunk/TOOLS/jats.bat /core_devl/trunk/TOOLS/jats.pl /core_devl/trunk/TOOLS/jats.sh /core_devl/trunk/TOOLS/jats_buildlinux.pl /core_devl/trunk/TOOLS/jats_buildperl.pl /core_devl/trunk/TOOLS/jats_ccmerge_build.pl /core_devl/trunk/TOOLS/jats_ccrelease.pl /core_devl/trunk/TOOLS/jats_ccsave_build.pl /core_devl/trunk/TOOLS/jats_lib_scan.pl /core_devl/trunk/TOOLS/jats_manifest.pl /core_devl/trunk/TOOLS/jats_metrics.pl /core_devl/trunk/TOOLS/jats_rewrite.pl /core_devl/trunk/TOOLS/jats_sandbox.pl /core_devl/trunk/TOOLS/jats_svn.pl /core_devl/trunk/TOOLS/jats_svnlabel.pl /core_devl/trunk/TOOLS/jats_svnrelease.pl /core_devl/trunk/TOOLS/jats_svnsave_build.pl /core_devl/trunk/TOOLS/jats_transform_file.pl /core_devl/trunk/TOOLS/jats_update_release.pl /core_devl/trunk/TOOLS/jats_upddep.pl /core_devl/trunk/TOOLS/jats_vars.pl /core_devl/trunk/TOOLS/jats_vcsrelease.pl /core_devl/trunk/TOOLS/jats_vcssave_build.pl /core_devl/trunk/TOOLS/jmake.pl /core_devl/trunk/TOOLS/makelib.pl2 /core_devl/trunk/UTILS/rpccpp/build_test.pl /core_devl/trunk/UTILS/stdmux/build_test.pl /core_devl/trunk/build.pl
|
| 227 |
6577 d 16 h |
dpurdie |
/core_devl/trunk/ |
DevTools/core_devl: Checkin by Svn Import
First Release in Release Manager
Major changes:
Minor changes:
* Jats Tool: create_dpkg
Added options to allow the utility to sanity test the package name and
version of the package being created. This is intended to be used by the
automated build system. New options are:
-pname=Package_Name
-pversion=Package_Version
Added option to allow the source package form to be tested, without
transferring the package. New options are:
-test
* Jats Tool: CCdiff
-output=filename now works. Previously only -out=filename worked.
-vob=name does not generate internal message under unix
* JATS Environment variables GBE_BUILDFILTER and GBE_PLATFORM can be either
a space separated or a comma separated list.
* Solaris Toolset
Disable the use of purify, purecov and quantify when building shared
libraries. Shared libraries are not supported by these tools. Executable
programs are still supported. |
|
/core_devl/trunk/BIN.linux_i386 /core_devl/trunk/BIN.linux_i386/ant /core_devl/trunk/BIN.linux_i386/cmdfile /core_devl/trunk/BIN.linux_i386/javac /core_devl/trunk/BIN.linux_i386/links.sh /core_devl/trunk/BIN.linux_i386/mkdepend /core_devl/trunk/BIN.solaris10_sparc32 /core_devl/trunk/BIN.solaris10_sparc32/ant /core_devl/trunk/BIN.solaris10_sparc32/cmdfile /core_devl/trunk/BIN.solaris10_sparc32/cp /core_devl/trunk/BIN.solaris10_sparc32/javac /core_devl/trunk/BIN.solaris10_sparc32/links.sh /core_devl/trunk/BIN.solaris10_sparc32/mkdepend /core_devl/trunk/BIN.solaris10_x86 /core_devl/trunk/BIN.solaris10_x86/ant /core_devl/trunk/BIN.solaris10_x86/cmdfile /core_devl/trunk/BIN.solaris10_x86/cp /core_devl/trunk/BIN.solaris10_x86/javac /core_devl/trunk/BIN.solaris10_x86/links.sh /core_devl/trunk/BIN.solaris10_x86/mkdepend /core_devl/trunk/BIN.sparc /core_devl/trunk/BIN.sparc/ant /core_devl/trunk/BIN.sparc/cmdfile /core_devl/trunk/BIN.sparc/cp /core_devl/trunk/BIN.sparc/javac /core_devl/trunk/BIN.sparc/links.sh /core_devl/trunk/BIN.sparc/mkdepend /core_devl/trunk/BIN.win32 /core_devl/trunk/BIN.win32/ShowDLLs.exe /core_devl/trunk/BIN.win32/ant.exe /core_devl/trunk/BIN.win32/awk.exe /core_devl/trunk/BIN.win32/basename.exe /core_devl/trunk/BIN.win32/bison.exe /core_devl/trunk/BIN.win32/cat.exe /core_devl/trunk/BIN.win32/chmod.exe /core_devl/trunk/BIN.win32/chown.exe /core_devl/trunk/BIN.win32/cksum.exe /core_devl/trunk/BIN.win32/cmdfile.exe /core_devl/trunk/BIN.win32/cmp.exe /core_devl/trunk/BIN.win32/cp.exe /core_devl/trunk/BIN.win32/date.exe /core_devl/trunk/BIN.win32/diff.exe /core_devl/trunk/BIN.win32/dirname.exe /core_devl/trunk/BIN.win32/du.exe /core_devl/trunk/BIN.win32/echo.exe /core_devl/trunk/BIN.win32/egrep.exe /core_devl/trunk/BIN.win32/env.exe /core_devl/trunk/BIN.win32/exctags.exe /core_devl/trunk/BIN.win32/exctags.html /core_devl/trunk/BIN.win32/expr.exe /core_devl/trunk/BIN.win32/extend.lst /core_devl/trunk/BIN.win32/find.exe /core_devl/trunk/BIN.win32/flex.exe /core_devl/trunk/BIN.win32/grep.exe /core_devl/trunk/BIN.win32/javac.exe /core_devl/trunk/BIN.win32/less.exe /core_devl/trunk/BIN.win32/libiconv2.dll /core_devl/trunk/BIN.win32/libintl3.dll /core_devl/trunk/BIN.win32/ln.exe /core_devl/trunk/BIN.win32/ls.exe /core_devl/trunk/BIN.win32/md5sum.exe /core_devl/trunk/BIN.win32/mkdepend.exe /core_devl/trunk/BIN.win32/mkdir.exe /core_devl/trunk/BIN.win32/mv.exe /core_devl/trunk/BIN.win32/od.exe /core_devl/trunk/BIN.win32/printenv.exe /core_devl/trunk/BIN.win32/pwd.exe /core_devl/trunk/BIN.win32/rm.exe /core_devl/trunk/BIN.win32/rmdir.exe /core_devl/trunk/BIN.win32/rpcgen.exe /core_devl/trunk/BIN.win32/sed.exe /core_devl/trunk/BIN.win32/sh.exe /core_devl/trunk/BIN.win32/touch.exe /core_devl/trunk/BIN.win32/uname.exe /core_devl/trunk/BIN.win32/wc.exe /core_devl/trunk/BIN.win32/which.exe /core_devl/trunk/BIN.win32/xargs.exe /core_devl/trunk/BIN.win32/xmake.exe /core_devl/trunk/BUILD /core_devl/trunk/BUILD/MakePackage.pl /core_devl/trunk/CFG /core_devl/trunk/CFG/PLATFORM /core_devl/trunk/CFG/PLATFORM/AMX /core_devl/trunk/CFG/PLATFORM/AMX.DEF /core_devl/trunk/CFG/PLATFORM/ARM9TDMI /core_devl/trunk/CFG/PLATFORM/ARM9TDMI.CFG /core_devl/trunk/CFG/PLATFORM/AVR_IAR /core_devl/trunk/CFG/PLATFORM/AVR_IAR.DEF /core_devl/trunk/CFG/PLATFORM/CMOS386 /core_devl/trunk/CFG/PLATFORM/CMOS68K /core_devl/trunk/CFG/PLATFORM/CSHARP /core_devl/trunk/CFG/PLATFORM/CSHARP.CFG /core_devl/trunk/CFG/PLATFORM/DAFBR_MOS /core_devl/trunk/CFG/PLATFORM/DAFBR_WIN /core_devl/trunk/CFG/PLATFORM/DEVLINUX.CFG /core_devl/trunk/CFG/PLATFORM/DF4OBE /core_devl/trunk/CFG/PLATFORM/DF4OBE.DEF /core_devl/trunk/CFG/PLATFORM/DOS16 /core_devl/trunk/CFG/PLATFORM/DOS16.DEF /core_devl/trunk/CFG/PLATFORM/DOS32 /core_devl/trunk/CFG/PLATFORM/DOS32.DEF /core_devl/trunk/CFG/PLATFORM/EEPP386 /core_devl/trunk/CFG/PLATFORM/EETP386 /core_devl/trunk/CFG/PLATFORM/EOS /core_devl/trunk/CFG/PLATFORM/EOSM68K /core_devl/trunk/CFG/PLATFORM/EOSM68K.DEF /core_devl/trunk/CFG/PLATFORM/EOSP386 /core_devl/trunk/CFG/PLATFORM/EOSP386.DEF /core_devl/trunk/CFG/PLATFORM/GENERIC /core_devl/trunk/CFG/PLATFORM/GMPCA /core_devl/trunk/CFG/PLATFORM/GO32 /core_devl/trunk/CFG/PLATFORM/GO32.DEF /core_devl/trunk/CFG/PLATFORM/H8S /core_devl/trunk/CFG/PLATFORM/H8S.DEF /core_devl/trunk/CFG/PLATFORM/HK386PC /core_devl/trunk/CFG/PLATFORM/HKAVM /core_devl/trunk/CFG/PLATFORM/HKAVM2 /core_devl/trunk/CFG/PLATFORM/HKBCP /core_devl/trunk/CFG/PLATFORM/HKDDU /core_devl/trunk/CFG/PLATFORM/HKGAK /core_devl/trunk/CFG/PLATFORM/HKMPR /core_devl/trunk/CFG/PLATFORM/HKPCA /core_devl/trunk/CFG/PLATFORM/INGEN /core_devl/trunk/CFG/PLATFORM/INGEN.DEF /core_devl/trunk/CFG/PLATFORM/JAVA /core_devl/trunk/CFG/PLATFORM/LINUX.CFG /core_devl/trunk/CFG/PLATFORM/LINUX86 /core_devl/trunk/CFG/PLATFORM/LINUX86.DEF /core_devl/trunk/CFG/PLATFORM/LINUX_ARMV4 /core_devl/trunk/CFG/PLATFORM/LINUX_ARMV4.DEF /core_devl/trunk/CFG/PLATFORM/LINUX_EMU /core_devl/trunk/CFG/PLATFORM/LINUX_EMU.CFG /core_devl/trunk/CFG/PLATFORM/LINUX_ETX /core_devl/trunk/CFG/PLATFORM/LINUX_ETX.CFG /core_devl/trunk/CFG/PLATFORM/LINUX_I386 /core_devl/trunk/CFG/PLATFORM/LINUX_I386.CFG /core_devl/trunk/CFG/PLATFORM/LINUX_I386.DEF /core_devl/trunk/CFG/PLATFORM/LMOS.CFG /core_devl/trunk/CFG/PLATFORM/LMOS_ARM9TDMI.CFG /core_devl/trunk/CFG/PLATFORM/LMOS_DEVLINUX.CFG /core_devl/trunk/CFG/PLATFORM/LMOS_LINUX_EMU.CFG /core_devl/trunk/CFG/PLATFORM/LMOS_LINUX_ETX.CFG /core_devl/trunk/CFG/PLATFORM/MCR /core_devl/trunk/CFG/PLATFORM/MCR.DEF /core_devl/trunk/CFG/PLATFORM/MERG /core_devl/trunk/CFG/PLATFORM/MOS68K /core_devl/trunk/CFG/PLATFORM/MOS68K.DEF /core_devl/trunk/CFG/PLATFORM/MOS68KRM /core_devl/trunk/CFG/PLATFORM/MOS68KRM.DEF /core_devl/trunk/CFG/PLATFORM/MOSCF /core_devl/trunk/CFG/PLATFORM/MOSCF.DEF /core_devl/trunk/CFG/PLATFORM/MPT /core_devl/trunk/CFG/PLATFORM/MPT.DEF /core_devl/trunk/CFG/PLATFORM/NGBCP /core_devl/trunk/CFG/PLATFORM/NGDDU /core_devl/trunk/CFG/PLATFORM/SOLARIS /core_devl/trunk/CFG/PLATFORM/SOLARIS.CFG /core_devl/trunk/CFG/PLATFORM/SOLARIS.DEF /core_devl/trunk/CFG/PLATFORM/SOLARIS10_SPARC32 /core_devl/trunk/CFG/PLATFORM/SOLARIS10_SPARC32.CFG /core_devl/trunk/CFG/PLATFORM/SOLARIS10_SPARC64 /core_devl/trunk/CFG/PLATFORM/SOLARIS10_SPARC64.CFG /core_devl/trunk/CFG/PLATFORM/SOLARIS10_X64 /core_devl/trunk/CFG/PLATFORM/SOLARIS10_X64.CFG /core_devl/trunk/CFG/PLATFORM/SOLARIS10_X86 /core_devl/trunk/CFG/PLATFORM/SOLARIS10_X86.CFG /core_devl/trunk/CFG/PLATFORM/SOLARIS_I386 /core_devl/trunk/CFG/PLATFORM/SOLARIS_I386.DEF /core_devl/trunk/CFG/PLATFORM/SOLARIS_SPARC /core_devl/trunk/CFG/PLATFORM/SOLARIS_SPARC.DEF /core_devl/trunk/CFG/PLATFORM/THRYON.DEF /core_devl/trunk/CFG/PLATFORM/THYRON /core_devl/trunk/CFG/PLATFORM/UNIX /core_devl/trunk/CFG/PLATFORM/VS2003 /core_devl/trunk/CFG/PLATFORM/VS2003.CFG /core_devl/trunk/CFG/PLATFORM/WCEIT3000 /core_devl/trunk/CFG/PLATFORM/WCEPA961 /core_devl/trunk/CFG/PLATFORM/WCEPA962 /core_devl/trunk/CFG/PLATFORM/WCEPA962_500 /core_devl/trunk/CFG/PLATFORM/WCEPCM7220 /core_devl/trunk/CFG/PLATFORM/WCEPSION_420 /core_devl/trunk/CFG/PLATFORM/WCEPSION_500 /core_devl/trunk/CFG/PLATFORM/WCEPSPC_arm /core_devl/trunk/CFG/PLATFORM/WCEPSPC_emu /core_devl/trunk/CFG/PLATFORM/WCEX86A420 /core_devl/trunk/CFG/PLATFORM/WCEX86A500 /core_devl/trunk/CFG/PLATFORM/WCEX86A500_SOM4455 /core_devl/trunk/CFG/PLATFORM/WIN32 /core_devl/trunk/CFG/PLATFORM/WIN32.CFG /core_devl/trunk/CFG/PLATFORM/WIN32.DEF /core_devl/trunk/CFG/PLATFORM/WINCE.CFG /core_devl/trunk/CFG/PLATFORM/Wce /core_devl/trunk/CFG/RULES /core_devl/trunk/CFG/RULES.DOS /core_devl/trunk/CFG/RULES.STD /core_devl/trunk/CFG/RULES.UNI /core_devl/trunk/CFG/RULES.WIN /core_devl/trunk/CFG/SH /core_devl/trunk/CFG/SH/EXTEND.LST /core_devl/trunk/CFG/SH/HISTORY.SH /core_devl/trunk/CFG/SH/PROFILE.SH /core_devl/trunk/CFG/SH/README /core_devl/trunk/CFG/SH/SH.VMC /core_devl/trunk/CFG/TOOLSET /core_devl/trunk/CFG/TOOLSET/AVR_IAR /core_devl/trunk/CFG/TOOLSET/AVR_IAR.DEF /core_devl/trunk/CFG/TOOLSET/AVR_IAR.RUL /core_devl/trunk/CFG/TOOLSET/CSHARP.DEF /core_devl/trunk/CFG/TOOLSET/CSHARP.PL /core_devl/trunk/CFG/TOOLSET/CSHARP.RUL /core_devl/trunk/CFG/TOOLSET/CYGNUS_THYRON /core_devl/trunk/CFG/TOOLSET/CYGNUS_THYRON.DEF /core_devl/trunk/CFG/TOOLSET/CYGNUS_THYRON.RUL /core_devl/trunk/CFG/TOOLSET/DAFBR /core_devl/trunk/CFG/TOOLSET/DAFBR.DEF /core_devl/trunk/CFG/TOOLSET/DAFBR.RUL /core_devl/trunk/CFG/TOOLSET/DJGPP /core_devl/trunk/CFG/TOOLSET/DJGPP.DEF /core_devl/trunk/CFG/TOOLSET/DJGPP.RUL /core_devl/trunk/CFG/TOOLSET/GCC.DEF /core_devl/trunk/CFG/TOOLSET/GCC.PL /core_devl/trunk/CFG/TOOLSET/GCC.RUL /core_devl/trunk/CFG/TOOLSET/GENERIC /core_devl/trunk/CFG/TOOLSET/GNUPRO_H8 /core_devl/trunk/CFG/TOOLSET/GNUPRO_H8.DEF /core_devl/trunk/CFG/TOOLSET/GNUPRO_H8.RUL /core_devl/trunk/CFG/TOOLSET/JAVA.DEF /core_devl/trunk/CFG/TOOLSET/JAVA.PL /core_devl/trunk/CFG/TOOLSET/MOS_MRI.LNT /core_devl/trunk/CFG/TOOLSET/MOS_MRI.PL /core_devl/trunk/CFG/TOOLSET/MOS_MRI.RUL /core_devl/trunk/CFG/TOOLSET/MOS_MRI_68K.DEF /core_devl/trunk/CFG/TOOLSET/MOS_MRI_CF.DEF /core_devl/trunk/CFG/TOOLSET/MRI68K /core_devl/trunk/CFG/TOOLSET/MRI68K.DEF /core_devl/trunk/CFG/TOOLSET/MRI68K.RUL /core_devl/trunk/CFG/TOOLSET/MugFiles.pl /core_devl/trunk/CFG/TOOLSET/PD386 /core_devl/trunk/CFG/TOOLSET/PD386.DEF /core_devl/trunk/CFG/TOOLSET/PD386.RUL /core_devl/trunk/CFG/TOOLSET/STANDARD.RUL /core_devl/trunk/CFG/TOOLSET/SUNWORKS.DEF /core_devl/trunk/CFG/TOOLSET/SUNWORKS.PL /core_devl/trunk/CFG/TOOLSET/SUNWORKS.RUL /core_devl/trunk/CFG/TOOLSET/TOOLSET.TXT /core_devl/trunk/CFG/TOOLSET/VCWCE /core_devl/trunk/CFG/TOOLSET/VCWCE.DEF /core_devl/trunk/CFG/TOOLSET/VCWCE.RUL /core_devl/trunk/CFG/TOOLSET/VCWIN32.DEF /core_devl/trunk/CFG/TOOLSET/VCWIN32.PL /core_devl/trunk/CFG/TOOLSET/VCWIN32.RUL /core_devl/trunk/CFG/TOOLSET/VCWIN32_NET2003.DEF /core_devl/trunk/CFG/TOOLSET/WC386 /core_devl/trunk/CFG/TOOLSET/WC386.DEF /core_devl/trunk/CFG/TOOLSET/WC386.RUL /core_devl/trunk/CFG/TOOLSET/WC4GW /core_devl/trunk/CFG/TOOLSET/WC4GW.DEF /core_devl/trunk/CFG/TOOLSET/WCDOS /core_devl/trunk/CFG/TOOLSET/WCDOS.DEF /core_devl/trunk/CFG/TOOLSET/WCDOS.RUL /core_devl/trunk/CFG/TOOLSET/co-msc60.lnt /core_devl/trunk/CFG/TOOLSET/cygnus.txt /core_devl/trunk/CFG/TOOLSET/exctags /core_devl/trunk/CFG/TOOLSET/exctags.rul /core_devl/trunk/CFG/TOOLSET/gnu_mpt /core_devl/trunk/CFG/TOOLSET/gnu_mpt.def /core_devl/trunk/CFG/TOOLSET/gnu_mpt.rul /core_devl/trunk/CFG/TOOLSET/keilc51v41 /core_devl/trunk/CFG/TOOLSET/keilc51v41.DEF /core_devl/trunk/CFG/TOOLSET/keilc51v41.RUL /core_devl/trunk/CFG/TOOLSET/m16c.def /core_devl/trunk/CFG/TOOLSET/m16c.pl /core_devl/trunk/CFG/TOOLSET/m16c.rul /core_devl/trunk/CFG/TOOLSET/pclint /core_devl/trunk/CFG/TOOLSET/pclint.rul /core_devl/trunk/ChangeLog.sh /core_devl/trunk/ChangeLog.txt /core_devl/trunk/PostInstall.sh /core_devl/trunk/Readme.txt /core_devl/trunk/TEMPLATES /core_devl/trunk/TEMPLATES/DPACKAGE /core_devl/trunk/TEMPLATES/ant-package /core_devl/trunk/TEMPLATES/ant-package/reports.xml /core_devl/trunk/TEMPLATES/ant-package/reportsdepends.xml /core_devl/trunk/TEMPLATES/basic /core_devl/trunk/TEMPLATES/basic/build.pl /core_devl/trunk/TEMPLATES/basic/makefile.pl /core_devl/trunk/TEMPLATES/basic/src /core_devl/trunk/TEMPLATES/basic/src/makefile.pl /core_devl/trunk/TEMPLATES/daf-basic /core_devl/trunk/TEMPLATES/daf-basic/build.pl /core_devl/trunk/TEMPLATES/daf-basic/makefile.pl /core_devl/trunk/TEMPLATES/daf-basic/src /core_devl/trunk/TEMPLATES/daf-basic/src/makefile.pl /core_devl/trunk/TEMPLATES/generic /core_devl/trunk/TEMPLATES/generic/build.pl /core_devl/trunk/TEMPLATES/generic/src /core_devl/trunk/TEMPLATES/generic/src/makefile.pl /core_devl/trunk/TEMPLATES/mos-thx /core_devl/trunk/TEMPLATES/mos-thx/build.pl /core_devl/trunk/TEMPLATES/mos-thx/static-lib /core_devl/trunk/TEMPLATES/mos-thx/static-lib/makefile.pl /core_devl/trunk/TEMPLATES/mos-thx/thx-module /core_devl/trunk/TEMPLATES/mos-thx/thx-module/makefile.pl /core_devl/trunk/TEMPLATES/readme.txt /core_devl/trunk/TEMPLATES/warnings.mri /core_devl/trunk/TEST /core_devl/trunk/TEST/dir with space /core_devl/trunk/TEST/dir with space/file with space /core_devl/trunk/TEST/jats-win-solaris /core_devl/trunk/TEST/jats-win-solaris/build.pl /core_devl/trunk/TEST/jats-win-solaris/makefile.pl /core_devl/trunk/TEST/jats-win-solaris/src /core_devl/trunk/TEST/jats-win-solaris/src/file1.c /core_devl/trunk/TEST/jats-win-solaris/src/file1.h /core_devl/trunk/TEST/jats-win-solaris/src/file2.xxx /core_devl/trunk/TEST/jats-win-solaris/src/makefile.pl /core_devl/trunk/TEST/version1 /core_devl/trunk/TEST/version1/SRC /core_devl/trunk/TEST/version1/SRC/INC /core_devl/trunk/TEST/version1/SRC/INC/HKDDU /core_devl/trunk/TEST/version1/SRC/INC/HKDDU/machine.h /core_devl/trunk/TEST/version1/SRC/INC/HKDDU/target.h /core_devl/trunk/TEST/version1/SRC/INC/SYS /core_devl/trunk/TEST/version1/SRC/INC/SYS/config.h /core_devl/trunk/TEST/version1/SRC/INC/UNIX /core_devl/trunk/TEST/version1/SRC/INC/UNIX/machine.h /core_devl/trunk/TEST/version1/SRC/INC/UNIX/target.h /core_devl/trunk/TEST/version1/SRC/INC/WIN32 /core_devl/trunk/TEST/version1/SRC/INC/WIN32/machine.h /core_devl/trunk/TEST/version1/SRC/INC/WIN32/target.h /core_devl/trunk/TEST/version1/SRC/INC/makefile.pl /core_devl/trunk/TEST/version1/SRC/INC/public.h /core_devl/trunk/TEST/version1/SRC/INC/sys.h /core_devl/trunk/TEST/version1/SRC/InstallPkg.sh /core_devl/trunk/TEST/version1/SRC/KERNEL /core_devl/trunk/TEST/version1/SRC/KERNEL/makefile.pl /core_devl/trunk/TEST/version1/SRC/TARGET /core_devl/trunk/TEST/version1/SRC/TARGET/AS /core_devl/trunk/TEST/version1/SRC/TARGET/AS/a.c /core_devl/trunk/TEST/version1/SRC/TARGET/AS/main.c /core_devl/trunk/TEST/version1/SRC/TARGET/AS/makefile.pl /core_devl/trunk/TEST/version1/SRC/TARGET/AS/n.c /core_devl/trunk/TEST/version1/SRC/TARGET/AS/t.c /core_devl/trunk/TEST/version1/SRC/TARGET/BC /core_devl/trunk/TEST/version1/SRC/TARGET/BC/a.c /core_devl/trunk/TEST/version1/SRC/TARGET/BC/makefile.pl /core_devl/trunk/TEST/version1/SRC/TARGET/BC/n.c /core_devl/trunk/TEST/version1/SRC/TARGET/BC/t.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX /core_devl/trunk/TEST/version1/SRC/TARGET/XX/makefile.pl /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t.h /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t00.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t01.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t02.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t03.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t04.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t05.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t06.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t07.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t08.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t09.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t10.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t11.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t12.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t13.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t14.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t15.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t16.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t17.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t18.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t19.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t20.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t21.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t22.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t23.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t24.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t25.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t26.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t27.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t28.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t29.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t30.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t31.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t32.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t33.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t34.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t35.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t36.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t37.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t38.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t39.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t40.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t41.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t42.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t43.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t44.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t45.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t46.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t47.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t48.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t49.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t50.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t51.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t52.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t53.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t54.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t55.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t56.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t57.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t58.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t59.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t60.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t61.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t62.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t63.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t64.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t65.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t66.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t67.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t68.c /core_devl/trunk/TEST/version1/SRC/TARGET/XX/t69.c /core_devl/trunk/TEST/version1/SRC/TARGET/makefile.pl /core_devl/trunk/TEST/version1/SRC/makefile.pl /core_devl/trunk/TEST/version1/build.bat /core_devl/trunk/TEST/version1/build.pl /core_devl/trunk/TEST/version1/build.sh /core_devl/trunk/TEST/version1/makefile.pl /core_devl/trunk/TEST/version1/package.pl /core_devl/trunk/TEST/version1/tree.dir /core_devl/trunk/TOOLS /core_devl/trunk/TOOLS/CCdiff.pl /core_devl/trunk/TOOLS/DEPLOY /core_devl/trunk/TOOLS/DEPLOY/CCaddSourceR.pl /core_devl/trunk/TOOLS/DEPLOY/CCcheckinR.pl /core_devl/trunk/TOOLS/DEPLOY/CCcheckout.pl /core_devl/trunk/TOOLS/DEPLOY/CCcheckoutR.pl /core_devl/trunk/TOOLS/DEPLOY/CClabeldiff.pl /core_devl/trunk/TOOLS/DEPLOY/CCundoCheckoutR.pl /core_devl/trunk/TOOLS/DEPLOY/CCviewInfo.pl /core_devl/trunk/TOOLS/DEPLOY/checkin-diff.pl /core_devl/trunk/TOOLS/DEPLOY/deploylib_cclabel.pl /core_devl/trunk/TOOLS/DEPLOY/findreplacetag.pl /core_devl/trunk/TOOLS/DEPLOY/findreplacetag.sh /core_devl/trunk/TOOLS/DEPLOY/getRmRn.pl /core_devl/trunk/TOOLS/DEPLOY/getRmRuntimeTree.pl /core_devl/trunk/TOOLS/DEPLOY/updatenodespec.pl /core_devl/trunk/TOOLS/LIB /core_devl/trunk/TOOLS/LIB/ArrayHashUtils.pm /core_devl/trunk/TOOLS/LIB/BuildName.pm /core_devl/trunk/TOOLS/LIB/BuildVersion.pm /core_devl/trunk/TOOLS/LIB/Clearcase /core_devl/trunk/TOOLS/LIB/Clearcase/.ccignore /core_devl/trunk/TOOLS/LIB/Clearcase/CheckinCmd.pm /core_devl/trunk/TOOLS/LIB/Clearcase/Cmd.pm /core_devl/trunk/TOOLS/LIB/Clearcase/CmdProc.pm /core_devl/trunk/TOOLS/LIB/Clearcase/FindCmd.pm /core_devl/trunk/TOOLS/LIB/Clearcase/IgnoreList.pm /core_devl/trunk/TOOLS/LIB/Clearcase/LsCheckoutCmd.pm /core_devl/trunk/TOOLS/LIB/Clearcase/LsCmd.pm /core_devl/trunk/TOOLS/LIB/Clearcase/UndoCheckoutCmd.pm /core_devl/trunk/TOOLS/LIB/ConfigurationFile.pm /core_devl/trunk/TOOLS/LIB/DBI.pm /core_devl/trunk/TOOLS/LIB/DeployUtils /core_devl/trunk/TOOLS/LIB/DeployUtils/BuildFile.pm /core_devl/trunk/TOOLS/LIB/DeployUtils/Logger.pm /core_devl/trunk/TOOLS/LIB/DeployUtils/RmPkgInfo.pm /core_devl/trunk/TOOLS/LIB/DescPkg.pm /core_devl/trunk/TOOLS/LIB/FileUtils.pm /core_devl/trunk/TOOLS/LIB/JatsDPackage.pm /core_devl/trunk/TOOLS/LIB/JatsEnv.pm /core_devl/trunk/TOOLS/LIB/JatsError.pm /core_devl/trunk/TOOLS/LIB/JatsLocateFiles.pm /core_devl/trunk/TOOLS/LIB/JatsMakeConfig.pm /core_devl/trunk/TOOLS/LIB/JatsMakeInfo.pm /core_devl/trunk/TOOLS/LIB/JatsProperties.pm /core_devl/trunk/TOOLS/LIB/JatsRmApi.pm /core_devl/trunk/TOOLS/LIB/JatsSystem.pm /core_devl/trunk/TOOLS/LIB/JatsVersionUtils.pm /core_devl/trunk/TOOLS/LIB/MakeEntry.pm /core_devl/trunk/TOOLS/LIB/PackageEntry.pm /core_devl/trunk/TOOLS/LIB/ReadBuildConfig.pm /core_devl/trunk/TOOLS/LIB/ReleaseManagerSelect.jar /core_devl/trunk/TOOLS/LIB/ToolsetPrinter.pm /core_devl/trunk/TOOLS/LIB/classes12.jar /core_devl/trunk/TOOLS/LIB/deploylib.pm /core_devl/trunk/TOOLS/armerge /core_devl/trunk/TOOLS/buildlib.pl /core_devl/trunk/TOOLS/cache_dpkg.pl /core_devl/trunk/TOOLS/common.pl /core_devl/trunk/TOOLS/create_dpkg.pl /core_devl/trunk/TOOLS/cvs2cl.pl /core_devl/trunk/TOOLS/escrow.pl /core_devl/trunk/TOOLS/gen_cots.pl /core_devl/trunk/TOOLS/gen_dirlist.pl /core_devl/trunk/TOOLS/gen_metrics.pl /core_devl/trunk/TOOLS/gen_msprojects.pl /core_devl/trunk/TOOLS/gen_packagelist.pl /core_devl/trunk/TOOLS/gen_winrc.pl /core_devl/trunk/TOOLS/installpkg.pl /core_devl/trunk/TOOLS/jats.bat /core_devl/trunk/TOOLS/jats.pl /core_devl/trunk/TOOLS/jats.sh /core_devl/trunk/TOOLS/jats_builder.pl /core_devl/trunk/TOOLS/jats_buildlinux.pl /core_devl/trunk/TOOLS/jats_buildperl.pl /core_devl/trunk/TOOLS/jats_cbuilder.pl /core_devl/trunk/TOOLS/jats_label.pl /core_devl/trunk/TOOLS/jats_lib_scan.pl /core_devl/trunk/TOOLS/jats_manifest.pl /core_devl/trunk/TOOLS/jats_rewrite.pl /core_devl/trunk/TOOLS/jats_sandbox.pl /core_devl/trunk/TOOLS/jats_save_build.pl /core_devl/trunk/TOOLS/jats_transform_file.pl /core_devl/trunk/TOOLS/jmake.pl /core_devl/trunk/TOOLS/makeif.pl /core_devl/trunk/TOOLS/makelib.pl /core_devl/trunk/TOOLS/makelib.pl2 /core_devl/trunk/TOOLS/test_rmconnection.pl /core_devl/trunk/UTILS /core_devl/trunk/UTILS/CMDFILE /core_devl/trunk/UTILS/CMDFILE/build.bat /core_devl/trunk/UTILS/CMDFILE/cdefs.h /core_devl/trunk/UTILS/CMDFILE/clean.bat /core_devl/trunk/UTILS/CMDFILE/cmdfile.c /core_devl/trunk/UTILS/CMDFILE/cmdfile.h /core_devl/trunk/UTILS/CMDFILE/cmdfile.lst /core_devl/trunk/UTILS/CMDFILE/cmdfile.tst /core_devl/trunk/UTILS/CMDFILE/cmdfile2.tst /core_devl/trunk/UTILS/CMDFILE/dosify.c /core_devl/trunk/UTILS/CMDFILE/gcc.c /core_devl/trunk/UTILS/CMDFILE/gccvpath.tst /core_devl/trunk/UTILS/CMDFILE/getopt.c /core_devl/trunk/UTILS/CMDFILE/getopt.h /core_devl/trunk/UTILS/CMDFILE/longopt.c /core_devl/trunk/UTILS/CMDFILE/longopt.h /core_devl/trunk/UTILS/CMDFILE/macro.c /core_devl/trunk/UTILS/CMDFILE/makefile.pl /core_devl/trunk/UTILS/CMDFILE/makefile.solaris /core_devl/trunk/UTILS/CMDFILE/makefile.unix /core_devl/trunk/UTILS/CMDFILE/makefile.vc /core_devl/trunk/UTILS/CMDFILE/mktemp.c /core_devl/trunk/UTILS/CMDFILE/realpath.c /core_devl/trunk/UTILS/CMDFILE/shtpath.c /core_devl/trunk/UTILS/CMDFILE/test.bat /core_devl/trunk/UTILS/CMDFILE/test.sh /core_devl/trunk/UTILS/CMDFILE/tolower.pl /core_devl/trunk/UTILS/CMDFILE/url.c /core_devl/trunk/UTILS/CMDFILE/util.c /core_devl/trunk/UTILS/CMDFILE/vcbuild.bat /core_devl/trunk/UTILS/CMDFILE/vcclean.bat /core_devl/trunk/UTILS/CMDFILE/vcvclean.bat /core_devl/trunk/UTILS/CMDFILE/vpath.c /core_devl/trunk/UTILS/DBI-JDBC /core_devl/trunk/UTILS/DBI-JDBC/ReadMe.txt /core_devl/trunk/UTILS/DBI-JDBC/build.pl /core_devl/trunk/UTILS/DBI-JDBC/src /core_devl/trunk/UTILS/DBI-JDBC/src/DBI.pm /core_devl/trunk/UTILS/DBI-JDBC/src/Manifest.txt /core_devl/trunk/UTILS/DBI-JDBC/src/build.xml /core_devl/trunk/UTILS/DBI-JDBC/src/com /core_devl/trunk/UTILS/DBI-JDBC/src/com/erggroup /core_devl/trunk/UTILS/DBI-JDBC/src/com/erggroup/jats /core_devl/trunk/UTILS/DBI-JDBC/src/com/erggroup/jats/ReleaseManagerSelect.java /core_devl/trunk/UTILS/DBI-JDBC/src/com/erggroup/jats/TimedBufferedReader.java /core_devl/trunk/UTILS/DBI-JDBC/src/makefile.pl /core_devl/trunk/UTILS/DBI-JDBC/src/test /core_devl/trunk/UTILS/DBI-JDBC/src/test/jats_test.pl /core_devl/trunk/UTILS/GnuWin32 /core_devl/trunk/UTILS/GnuWin32/coreutils-5.3.0.exe /core_devl/trunk/UTILS/GnuWin32/which-2.16-4.exe /core_devl/trunk/UTILS/LIBWIN32 /core_devl/trunk/UTILS/LIBWIN32/cdefs.h /core_devl/trunk/UTILS/LIBWIN32/dirent.c /core_devl/trunk/UTILS/LIBWIN32/dirent.h /core_devl/trunk/UTILS/LIBWIN32/makefile.vc /core_devl/trunk/UTILS/LIBWIN32/testdir.c /core_devl/trunk/UTILS/LIBWIN32/unistd.h /core_devl/trunk/UTILS/LIBWIN32/vcbuild.bat /core_devl/trunk/UTILS/MKDEPEND /core_devl/trunk/UTILS/MKDEPEND/CPP.ED /core_devl/trunk/UTILS/MKDEPEND/MAKEFILE.386 /core_devl/trunk/UTILS/MKDEPEND/MKDEPEND.1 /core_devl/trunk/UTILS/MKDEPEND/MKDEPEND.MAN /core_devl/trunk/UTILS/MKDEPEND/REF /core_devl/trunk/UTILS/MKDEPEND/REF/STDARGV.C /core_devl/trunk/UTILS/MKDEPEND/Xfuncproto.h /core_devl/trunk/UTILS/MKDEPEND/Xosdefs.h /core_devl/trunk/UTILS/MKDEPEND/argv.c /core_devl/trunk/UTILS/MKDEPEND/cppsetup.c /core_devl/trunk/UTILS/MKDEPEND/def.h /core_devl/trunk/UTILS/MKDEPEND/ifparser.c /core_devl/trunk/UTILS/MKDEPEND/ifparser.h /core_devl/trunk/UTILS/MKDEPEND/imakedep.h /core_devl/trunk/UTILS/MKDEPEND/include.c /core_devl/trunk/UTILS/MKDEPEND/main.c /core_devl/trunk/UTILS/MKDEPEND/makefile.pl /core_devl/trunk/UTILS/MKDEPEND/makefile.solaris /core_devl/trunk/UTILS/MKDEPEND/makefile.unix /core_devl/trunk/UTILS/MKDEPEND/makefile.vc /core_devl/trunk/UTILS/MKDEPEND/parse.c /core_devl/trunk/UTILS/MKDEPEND/pr.c /core_devl/trunk/UTILS/MKDEPEND/test.c /core_devl/trunk/UTILS/MKDEPEND/vcbuild.bat /core_devl/trunk/UTILS/Rpcgen /core_devl/trunk/UTILS/Rpcgen/CHANGE.LOG /core_devl/trunk/UTILS/Rpcgen/CHANGES.DOC /core_devl/trunk/UTILS/Rpcgen/DOS16.mk /core_devl/trunk/UTILS/Rpcgen/MAKEFILE /core_devl/trunk/UTILS/Rpcgen/MAKEFILE.95 /core_devl/trunk/UTILS/Rpcgen/MAKEFILE.PL /core_devl/trunk/UTILS/Rpcgen/MAKEFILE.SUN /core_devl/trunk/UTILS/Rpcgen/MAKEFILE.WC /core_devl/trunk/UTILS/Rpcgen/RINDEX.C /core_devl/trunk/UTILS/Rpcgen/RPCGEN_N.1 /core_devl/trunk/UTILS/Rpcgen/RPC_CLNT.C /core_devl/trunk/UTILS/Rpcgen/RPC_COUT.C /core_devl/trunk/UTILS/Rpcgen/RPC_HOUT.C /core_devl/trunk/UTILS/Rpcgen/RPC_MAIN.C /core_devl/trunk/UTILS/Rpcgen/RPC_PARS.C /core_devl/trunk/UTILS/Rpcgen/RPC_PARSE.H /core_devl/trunk/UTILS/Rpcgen/RPC_SAMP.C /core_devl/trunk/UTILS/Rpcgen/RPC_SCAN.C /core_devl/trunk/UTILS/Rpcgen/RPC_SCAN.H /core_devl/trunk/UTILS/Rpcgen/RPC_SVCO.C /core_devl/trunk/UTILS/Rpcgen/RPC_TBLO.C /core_devl/trunk/UTILS/Rpcgen/RPC_UTIL.C /core_devl/trunk/UTILS/Rpcgen/RPC_UTIL.H /core_devl/trunk/UTILS/Rpcgen/VC.BAT /core_devl/trunk/UTILS/Rpcgen/rpc /core_devl/trunk/UTILS/Rpcgen/rpc/types.h /core_devl/trunk/UTILS/SH /core_devl/trunk/UTILS/SH/ARGV.C /core_devl/trunk/UTILS/SH/DIRECTOR.C /core_devl/trunk/UTILS/SH/GLOB.C /core_devl/trunk/UTILS/SH/INCLUDE /core_devl/trunk/UTILS/SH/INCLUDE/GLOB.H /core_devl/trunk/UTILS/SH/INCLUDE/LANGINFO.H /core_devl/trunk/UTILS/SH/INCLUDE/NL_TYPES.H /core_devl/trunk/UTILS/SH/INCLUDE/SYS /core_devl/trunk/UTILS/SH/INCLUDE/SYS/NULL.H /core_devl/trunk/UTILS/SH/INCLUDE/SYS/PROTO.H /core_devl/trunk/UTILS/SH/INCLUDE/SYS/README /core_devl/trunk/UTILS/SH/INCLUDE/SYS/TYPES_OLD.H /core_devl/trunk/UTILS/SH/MAKEFILE.PL /core_devl/trunk/UTILS/SH/PTYPE.C /core_devl/trunk/UTILS/SH/SH.H /core_devl/trunk/UTILS/SH/SH10.C /core_devl/trunk/UTILS/SH/SH11.C /core_devl/trunk/UTILS/SH/SH2.C /core_devl/trunk/UTILS/SH/SH4.C /core_devl/trunk/UTILS/SH/SH5.C /core_devl/trunk/UTILS/SH/SH6.C /core_devl/trunk/UTILS/SH/STDARGV.C /core_devl/trunk/UTILS/SH/SYSTEM.C /core_devl/trunk/UTILS/SH/Sh1.c /core_devl/trunk/UTILS/SH/Sh12.c /core_devl/trunk/UTILS/SH/Sh13.c /core_devl/trunk/UTILS/SH/Sh3.c /core_devl/trunk/UTILS/SH/Sh7.c /core_devl/trunk/UTILS/SH/Sh8.c /core_devl/trunk/UTILS/SH/Sh9.c /core_devl/trunk/UTILS/SH/WC386.MK /core_devl/trunk/UTILS/SH/WCX86.MK /core_devl/trunk/UTILS/SH/makefile.vc /core_devl/trunk/UTILS/SH/test /core_devl/trunk/UTILS/SH/test/test1.sh /core_devl/trunk/UTILS/SH/test/test2.sh /core_devl/trunk/UTILS/SH/test/test3.sh /core_devl/trunk/UTILS/SH/test/test4.sh /core_devl/trunk/UTILS/SH/vcbuild.bat /core_devl/trunk/UTILS/ShowDlls /core_devl/trunk/UTILS/ShowDlls/build.pl /core_devl/trunk/UTILS/ShowDlls/src /core_devl/trunk/UTILS/ShowDlls/src/ShowDLLs.cpp /core_devl/trunk/UTILS/ShowDlls/src/makefile.pl /core_devl/trunk/UTILS/bad-progs /core_devl/trunk/UTILS/bad-progs/build.pl /core_devl/trunk/UTILS/bad-progs/src /core_devl/trunk/UTILS/bad-progs/src/ant.c /core_devl/trunk/UTILS/bad-progs/src/javac.c /core_devl/trunk/UTILS/bad-progs/src/makefile.pl /core_devl/trunk/UTILS/javatar /core_devl/trunk/UTILS/javatar/javatar-2.5.zip
|